Secondary Construction: I’ve been surprised how much secondary construction has been necessary as part of the steps’ replacement. First the
replaced water line at the bottom of the hill, then this new sewer line that was needed at the top.
Snapped on
06.10.04
|| More
77 Steps Photos ||
Comments (0)